Saturday, November 3, 2007
Wednesday, June 6, 2007
Finally--an update!
I know, I know...."What took you so long?" Construction has been slow going and not too interesting, but things are really coming together now.
Big tease! Appliaces arrived 6/1/07, but are waiting to be installed.
Lastly, the beadboard was put up last week and the downstairs bath got the tile floor completed. These shots don't show it grouted, so I'll have to get a shot of that later.
Wednesday, May 23, 2007
Sunday, May 20, 2007
Cabinets....
When the kids and I got back from Missouri, we found the cabinet installation almost complete and some of the interior doors are installed! Below is what you would see if you walked in the front door.
Remember what it used to look like? I can't give you the same angle since there USED to be a wall between the two rooms!
Tuesday, May 15, 2007
FEAST or Famine...
On Monday, May 14th, just when I thought no workers were coming, the shower stall showed up--finally. THEN, the kitchen cabinets arrived a week early and a few hours later...the hard wood flooring arrived!
Below is the base for the shower installed after the concrete was poured on Tuesday.
And.....the Kitchen cabinets are being installed this week!
I LOVE my new Pantry!
Thanks for checking in!
Below is the base for the shower installed after the concrete was poured on Tuesday.
And.....the Kitchen cabinets are being installed this week!
I LOVE my new Pantry!
Thanks for checking in!
Saturday, May 12, 2007
We're PLASTERED!!
This past week, the wallboard went up and the platerering was completed (with the exception of the kitchen and dining room ceilings that were mistakenly textured. These will be smoothed out either May 14th or 15th).
Here is the view from the entryway looking up to the kitchen.
Below is the plastered kitchen.
This view below shows the finished bathroom walls as viewed from the office/guest room.
Here is the view from the entryway looking up to the kitchen.
Below is the plastered kitchen.
This view below shows the finished bathroom walls as viewed from the office/guest room.
Saturday, May 5, 2007
May 5th (Week 6 completed)
Inspections, Inspections!
This week the electric, plumbing and framing inspections were completed. Monday the insulation should be inspected
and then...drum roll please.....the plastering may begin! We are still waiting on the shower stall which was due Wed, Thurs or Fri of last week. Hmm...But we have the rest of the plumbing fixtures just waiting to go in!
We also had the sub floor completed, temporary wall was taken down and new windows went into the kitchen and bath.